1. Welcome
    1. Use and limits
    2. Objective
    3. Introduction
    4. Overview
    5. System requirements
  2. Get started
  3. Benefits
    1. Buildings geolocation
    2. BIM management
    3. Documents
    4. Project management
    5. Asset management
    6. Measure and monitor
    7. Dashboard
  4. Home page and user interface
    1. “Building in Cloud” command
    2. “User profile” command
    3. “Notify” command
    4. “Settings” command
    5. The “Current position bar”
    6. The “Main menu toolbar”
    7. The “Command menu area”
    8. The “Working space area”
    9. The “BIM button”
  5. Settings and configuration
    1. Main settings
      1. System settings
        1. Manage the system settings
          1. Manage the Organizations
        2. The General command
        3. Subscription
      2. Users and permission
        1. View system user
        2. New user
        3. Manage user
          1. Roles and permission
    2. Buildings settings
      1. Manage building settings
        1. Geolocation of buildings
        2. Manage buildings
    3. General settings
      1. Registries
        1. New companies
      2. Components
      3. Lists
        1. Add entries to the list
        2. Edit the list entries
  6. BIM Management
    1. BIM Model management
      1. BIM property
      2. Display commands
      3. BIM actions
      4. The “BIM button”
  7. Building Explorer
  8. Buildings
    1. New building
    2. Geolocate a building
    3. Manage buildings
      1. Delete a building
    4. Linked BIM model
      1. Building’s floors
    5. Building file
      1. Information management of a building
      2. Construction’s data
      3. Water and gas installations
      4. Electrical and special systems
      5. HVAC system
      6. Print Building File
    6. Cost Information
  9. Team
    1. View the team members list
    2. Invite users
    3. Team management
    4. Skills
      1. Skills management
    5. Team members communication
      1. Send messages
      2. Manage messages
      3. Notify
        1. View notifications
    6. Team Member filters
  10. Documents
    1. View content
      1. Details of a document
      2. View documents
      3. Register
      4. Task with a document
      5. Issue on a document
    2. Organize documents
      1. Create a new folder
      2. Delete documents
      3. Access permission
        1. Manage access permissions
    3. New documents
    4. Document management
      1. Actions on documents
        1. Check-in / Check-out
        2. Move
      2. New version
        1. Create the QR code to associate to a file
        2. Verify document version
      3. Recover documents
      4. Documents filters
  11. Tasks
    1. View tasks
      1. Dashboard
        1. View dashboard
    2. Organize tasks
      1. Create a new task
        1. Property
      2. Tasks management
        1. Check lists
        2. Documents
        3. Task’s notes
        4. History
      3. Delete
      4. View in the BIM model
      5. Print/Export
    3. Tasks filters
  12. Issues
    1. View issues
    2. Dashboard
      1. View dashboard
    3. Organize issues
      1. Create a new issue
        1. Property
      2. Issues management
        1. Check lists
        2. Documents
        3. Issue notes
        4. History
      3. Delete
      4. View in the BIM model
      5. Print/Export
    4. Issues filters
  13. Spaces
  14. Components
    1. View components
    2. New components
    3. Gestione componenti
      1. Cancellare i componenti
      2. Stampa/Esporta
      3. Azioni sui componenti
    4. Visualizzare i componenti di un edificio nel modello BIM
    5. Tipi di componenti
    6. Search components by Tag
    7. Components filters
  15. Safety
  16. Service level
  17. 4BT CE
    1. 4BT-CE Introduction
    2. 4BT-CE Welcome
    3. 4BT-CE Estimating
      1. Home
      2. Price List
      3. Manage Estimate
      4. Security Features
      5. Service Level Agreement

Notification Management – This feature is only available in the Professional level.

BiC hosts an automated notification system that traces and records activities performed by each individual member of building teams

Notifications are completely automatic but can be set up so that each team member receives only the notifications that are appropriate to their work.

To manage the notification system select the “Team” menu from the main menu as shown below.

 

The “Team” menu

 

Select the “Notification settings” command as shown in the figure below.

 

The “Set notifications” command allows access to the management of the notification system.

 

The notification system is defined via a matrix defined by the type of activity performed, and associated competency.

By selecting the “box” corresponding to the intersection of the competency and activity, those members will receive a notification of the action carried out by another team member.

For example, as shown in the figure above, the members of the team belonging to the competences: Bim Specialist – Architect; Bim Specialist – MEP; Bim Specialist – Structure; Bim Coordinator or BIM VR will receive a notification that a new user has been invited to become a member of the team. Team members with Assigned to / Operator and Construction skills will not be notified.

The following activity groups are included in the notification system: Team; Documents; Activities and Problems.

By selecting the box “Always send an email copy”, you can also send an email with the notification.

Yes No Suggest edit
Suggest Edit